T-Brick Shed: Poured Adobe Floor

I finished the poured adobe portion of the floor today. The section we did last week was still too wet to walk on so I estimate we have at least two weeks to wait before we can think about sealing it with boiled linseed oil. I'm sure I can find something to keep me busy in the meantime.
This will probably be the last day I used the concrete mixer for this project. Hurrah! It survived!

Jean and Currell did a great job on the east and west sides of the building last week. I'm finishing up the center.



Comments

Popular posts from this blog

Black Soldier Fly Larva Harvester

Roundwood Building Workshop

Apartment Homesteading: Growing Sprouts in a Milk/Juice Carton