T-Brick Shed: A Little Labo(u)r on Labor Day

So I managed to cajole my bride into spending her Labor day working on the shed. We got a lot done including installing the door frame, a screen window and some mud detail work.
Passing cob balls through the window

The threshold solidified quite nicely


Capping the walls inside

Installing the door frame.

It took some shimming and pounding with the sledge hammer but we got the door frame in and squared up. I'll have to make a custom door. I'll see if I can get my hands on some old fence planks.

Installing a screen window on the back wall.


Comments

Popular posts from this blog

Black Soldier Fly Larva Harvester

Roundwood Building Workshop

T-Brick Shed: Rubble Trench French Drain Installation